Rear Extension in Bromley | RCB Design & Build

Rear extensions are the most common project we deliver in Bromley — single-storey kitchen-diner extensions account for roughly a third of our annual pipeline. RCB Design & Build delivers rear extension projects right across Bromley (BR1) from our Dartford base — typically on site within 48 hours of enquiry, with a fixed written quotation in 5 working days. Our typical rear extension project in Bromley costs between £39,000 and £105,000 in 2026, with most modern detached and Victorian terraces landing around £72,000. We are FMB, TrustMark, Checkatrade and TrustATrader accredited and operate as a Principal Contractor under CDM 2015.

Why Bromley homeowners choose RCB

A strong market for high-spec rear extensions, side returns and full mansard lofts. Affluent homeowners typically choose premium finishes. Working out of London Borough of Bromley's area, we know the planners, the local building inspectors, and the named conservation officers — that personal relationship cuts weeks off the consenting timeline. Our typical Bromley project is on modern detached within easy reach of Bromley High Street or Crystal Palace Park, and we work with a small panel of trusted London-area subcontractors we have used for years.

What's included in our rear extension price

Quotation covers steel beam(s), foundations to Building Control, structural glazing or aluminium sliding doors, flat-roof construction with single-ply or warm-roof build-up, MVHR or trickle vents, first-fix M&E, plaster and screed. Second-fix (kitchen, flooring, paint) is client-supplied for cost control. Our written quotation covers labour, first-fix materials, project management, scaffolding, skips, Building Control fees and statutory inspections. Second-fix materials (kitchens, bathrooms, flooring, tiles, paint, sanitaryware) are supplied by the client as a deliberate cost-control measure — this typically saves homeowners £5,760–£10,800 in trade markup. We exclude planning fees, party-wall surveyor fees and structural engineer drawings, which we coordinate at cost.

Bromley planning, party walls and Building Regs

Multiple conservation areas around Chislehurst and Bickley — design review is common, allow extra time at planning. Rear extensions live or die on the rear elevation glazing — sliding doors, structural slot glazing or roof lights set the overall feel and most of the lighting strategy. Note that Bromley has multiple conservation areas — design must match prevailing materials, roof shape and fenestration. Party Wall Awards are typically needed for any excavation within 3 metres of a shared wall — we coordinate the surveyor and serve notices. Building Control is lodged at the start, with inspections at foundation, damp-course, pre-plaster and completion stages.

Timeline and process for Bromley projects

Single-storey rear extensions run 8–12 weeks on site for a 25–35 m² scheme. Pre-construction (drawings, Building Control, party walls) typically adds 6–10 weeks before mobilisation. We hold a weekly call with the client throughout, send a written progress report with photos every Friday, and the lead PM is always reachable on WhatsApp. From BR1 postcodes we can have someone on site within 48 hours of a phone call.

Guarantees and after-care

Every project we deliver in Bromley is backed by a 12-month workmanship guarantee. Where we install manufacturer-warranted systems (roofing membranes, windows, MVHR), the manufacturer warranty (typically 10–25 years) runs alongside. As an FMB member we can also arrange an FMB-backed 2-year insurance warranty on qualifying Bromley schemes — worth considering for any project above £50,000.

Rear Extension cost in Bromley2026 price guide

Project sizeFromTo
Small rear (≤20 m²)£39,000£51,000
Standard rear (20–30 m²)£47,000£59,000
Large rear (30–45 m²)£55,000£70,000
Full-width rear (45 m²+)£62,000£78,000

Indicative Bromley (BR1) ranges for 2026. A site visit firms the figure to +/-5%.

Frequently asked questions

How much does a rear extension cost in Bromley in 2026?

Typical Bromley pricing ranges from £39,000 to £105,000 depending on size, finish and site complexity. Bromley sits in the mid-band of our delivery area. A free site visit firms the number up to ±5%.

How long will a rear extension take in Bromley?

Allow 6–12 weeks of design, planning and procurement before work starts, then a project-dependent build phase. Single-storey rear extensions run 8–12 weeks on site for a 25–35 m² scheme. Pre-construction (drawings, Building Control, party walls) typically adds 6–10 weeks before mobilisation. We share a Gantt-style schedule with every quotation.

Do I need planning permission for a rear extension in Bromley?

Up to 6 m on a detached and 4 m on a semi/terrace can sit inside Larger Home PD via the Neighbour Consultation Scheme. Conservation areas, Article 4 zones and any rear scheme above 8m³ on a flat will need full planning.

Which areas of Bromley do you cover?

We cover all of BR1 and the surrounding London postcodes from our Dartford base. Recent projects sit close to Bromley High Street and Crystal Palace Park. Anywhere within 45 minutes of Dartford is comfortably inside our core delivery zone.

Is RCB insured?

Yes — we hold £5 million Public Liability, £10 million Employer's Liability, full Contract Works insurance and Professional Indemnity. Certificates are provided with every quotation.

How do I get a quote?

Use the free instant calculator at /quote for a 60-second ballpark, configure your project in detail at /configure, or call +44 7359 872594. We respond to every enquiry within 4 working hours.

Ready to start your rear extension in Bromley?

Get a free site visit and a fixed written quotation within 5 working days. No obligation, no hard sell.