🍳

Kitchen Renovations by RCB Design & Build

A kitchen renovation transforms the heart of your home. RCB Design & Build handles every trade involved — demolition of the old kitchen, re-routing plumbing and electrics, plastering, tiling, flooring, and decoration. Kitchen units, worktops, appliances, and tiles are client-supplied (second-fix materials), which means you choose exactly what you want at whatever budget suits you, with no builder markup. We simply install what you select. If structural work is needed to open up the layout (wall removal, RSJ installation), we manage that too.

Average Cost
£8,000 – £35,000
Typical Duration
3–6 weeks
Checkatrade
10/10 Rating
What We Offer

TYPES OF KITCHENS WE BUILD

01

Full Kitchen Renovation

Complete strip-out and rebuild including new electrics, plumbing, plastering, tiling, and decoration.

02

Kitchen Extension

Extend the property to create a larger kitchen or open-plan kitchen-diner with bi-fold doors to the garden.

03

Open-Plan Kitchen-Diner

Remove the wall between kitchen and dining room (RSJ installation) to create a modern open-plan living space.

How We Work

OUR PROCESS

Step 01
Free Consultation
Book a free site visit. We assess your property, take measurements, discuss your requirements, and advise on planning and Building Regulations.
Step 02
Design & Planning
We help you develop the design, submit planning applications if needed, and coordinate with structural engineers and architects.
Step 03
Detailed Estimate
You receive a fixed written quotation with a full scope of works and itemised breakdown. No hidden costs.
Step 04
Build Phase
Our team manages every trade under one contract. You get a dedicated project manager and regular progress updates.
Step 05
Handover
Final snagging walk-through, Building Control sign-off, and handover with all certificates, warranties, and documentation.

What sets our kitchens service apart

  • Existing kitchen stripped out and skipped on day one.
  • Electrics and plumbing re-routed to suit new layout before plastering.
  • Client orders kitchen units for delivery timed to our programme.
  • We install units, worktops, tiling, and connect appliances.
Why Choose Us

WHY CHOOSE RCB DESIGN & BUILD

🏆
FMB Member
Federation of Master Builders accredited. Independently vetted, insured, and held to the highest standards.
TrustMark Registered
Government-endorsed quality scheme. All work covered by the TrustMark guarantee framework.
10/10 Checkatrade
Perfect score from verified homeowner reviews. Real feedback from real clients.
🔧
20+ Years Experience
Over two decades of hands-on construction experience. Built by a contractor, run by a contractor.
📋
Fixed Price Quotes
You get a detailed written quotation with a full breakdown. The price you agree is the price you pay.
👷
Principal Contractor
We manage every trade under one contract. One point of contact, one project manager, one company to deal with.
🏗️
Building Control Managed
We handle Building Regulations from application to completion certificate. No paperwork for you.
🤝
No Hard Sell
Free site visit, honest advice, and a written quotation within 5 working days. No obligation whatsoever.
Common Questions

KITCHENS FAQ

How long does a kitchen renovation take?

A straightforward kitchen renovation (strip-out, re-plumb, re-wire, plaster, tile, and fit) takes 3–4 weeks. If structural work is involved (wall removal, RSJ), add 1–2 weeks. Kitchen extension projects take 8–12 weeks.

Why are kitchen units client-supplied?

We believe you should choose your own kitchen — from IKEA to Howdens to bespoke joinery — at whatever price point suits you. By supplying units yourself, you avoid any builder markup and get exactly the specification you want. We install whatever you purchase.

Do you install kitchen appliances?

Yes. We install all built-in appliances (oven, hob, extractor, dishwasher, fridge) as part of the renovation. Freestanding appliances simply need positioning and connecting.

Can you remove a wall to create an open-plan kitchen?

Yes. We regularly remove load-bearing walls and install steel beams (RSJs) to create open-plan kitchen-diners. The structural engineer designs the beam, and we manage the Building Regulations approval.

Do I need to move out during a kitchen renovation?

Not usually. We can set up a temporary kitchen area in another room so you have access to a kettle, microwave, and running water throughout the works.

Get a Free Kitchens Quote

Tell us about your kitchens project and we'll be in touch within 2 hours. Free site visit, no obligation.

FMB · TrustMark · Checkatrade · TrustATrader

Our Promise

OUR GUARANTEES TO YOU

Free Consultation

Book a free site visit with no obligation whatsoever. Honest advice, no hard sell.

Fixed Price Guarantee

The price we quote is the price you pay. No hidden extras, no surprises.

Price Match Promise

Found a like-for-like quote for less? We'll match it. Fair pricing guaranteed.

Up to 25 Year Warranty

Structural work backed by up to 25 years. FMB & TrustMark registered for your peace of mind.

Ready to start your kitchens project?

Get a free site visit and a fixed written quotation within 5 working days. No obligation, no hard sell.

RCB Design & Build · +44 7359 872594 · contact@rcbGroup.co.uk
RCB Design & Build | A2Z Principal Contractors · Greater London & Surrounding Counties